Search Government Infrastructure Services Contracts for Bid by MASSACHUSETTS
GovWin IQ: Find and Win Government Contracts
GovWin IQ tracked 25 infrastructure services contracts that came up for bid by MASSACHUSETTS in a one year period.
Sample Contracts to Bid for MASSACHUSETTS
Government Agency | Type | Description | Location | Contact |
---|---|---|---|---|
MASSACHUSETTS » NEWBURYPORT CITY SCH | BID | On-Call Water Systems Excavation: Emergency and Routine Excavation For Water Main Breaks Service Leaks Hydrant Repair And Or Replacement Valve Installations | Essex (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » CAMBRIDGE HOUSING AUTHORITY | BID | Site Improvement, Paving, Storm Drainage, Curbs, Sidewalks, And Ramps. | Cambridge (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » BARNSTABLE, CITY OF (BARNSTABLE) | BID | LEGAL AD ONLY FY25 Phinney�??s Lane Neighborhood Sewer Expansion Design Services | Barnstable County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » MONROE, TOWN OF (FRANKLIN) | BID | Installation of 570 lf 15" HDPE drain pipe, 22 drainage structures, 5,000 sy road reconstruction, 730 sy grassed swale, 2,230 lf bituminous curb, 1,860 lf guardrail and associated work | Hudson (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » SWAMPSCOTT, TOWN OF (ESSEX) | BID | Atlantic, Beach Bluff and Palmer Avenue Water Main Improvements | Essex (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » REVERE, CITY OF (SUFFOLK) | BID | MUN-2024-1019 Liberty Avenue Drainage Improvements Project | Revere (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » SPENCER, TOWN OF (WORCESTER) | BID | EQUIPMENT AND OPERATOR SERVICES for Water and Sewer Main Installation and Repair, and Highway Drainage (Excavator, Loader, 10 Wheel Dump Truck) | Spencer (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » BRAINTREE, TOWN OF (NORFOLK) | BID | construction of the next section of the Plain Street Cemetery including: excavation and crushing/reuse of boulders, earthwork, furnishing and installing stormwater drainage systems and water supply systems, furnishing and installing concrete bar foundations and grave markings, furnishing and installing landscaping and all other elements required to provide a cemetery section expansion | Braintree (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » WAYLAND, TOWN OF (MIDDLESEX) | BID | furnishing and installing approx. 3,500 LF of 8" water main on Tally Ho Lane and Red Barn Road with associated valves, fittings, hydrants, and appurtenances. Additive Alternate A consists of approx. 700 LF of 8" water main on Graybirch Lane | Middlesex County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » REVERE, CITY OF (SUFFOLK) | BID | Liberty Avenue Drainage Improvements Project | Revere (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » REVERE, CITY OF (SUFFOLK) | BID | MUN-2024-1006 Liberty Avenue Drainage Improvements Project | Revere (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » WILMINGTON, TOWN OF (MIDDLESEX) | BID | Screener Rental; Guardrail; Pavement Markings; Roadway Management Services*; Bituminous Products at Plant; Crack Sealing; Tree Planting Services; Stormwater Pond Maintenance Services; and Catch Basin Cleaning Services | Middlesex County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » DRACUT, TOWN OF (MIDDLESEX) | BID | Awarding Agency | Dracut (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » NEW BEDFORD, CITY OF (BRISTOL) | BID | Completing construction of the North Terminal Phase 2 sheet pile and king pile bulkhead, along with Dredging of the North Terminal Phase 2 site, installation of storm water utilities, backfill and compaction of the bulkhead footprint and site infield area using material currently stockpiled at the North Terminal Phase 1 site and imported material, installation of various site components, including finished grading of the proposed site. | Bristol County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » LAWRENCE, CITY OF (ESSEX) | BID | Runway 5 End Drainage Improvement Project | Essex (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » WARREN, TOWN OF (WORCESTER) | BID | Installation of water line, stormwater drainage, minor sewer repair, street and sidewalk | Warren (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » WARREN, TOWN OF (WORCESTER) | BID | Installation of 360 LF 8-inch water main, 1500 LF HDPE and and 21 drain structures, 6700 SF concrete walk, 2760 LF concrete and bituminous curb, 3780 SY road reconstruction and associated work | Warren (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » LENOX, TOWN OF (BERKSHIRE) | BID | Church Street Sewer and Fire Service Improvements and Lenox Village Sidewalk Replacement | Berkshire County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » NORTHAMPTON, CITY OF (HAMPSHIRE) | BID | Drainage Improvements 2024-Replacemnent Of Strom Drainage Outfall On Mass Rail Trail Adjacent To Adare Place | Hampshire County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » BELMONT, TOWN OF (MIDDLESEX) | BID | The scope of work includes the construction of approximately, 1,600 linear feet of new 8-inch ductile iron water main, transfer and installation of water services, installation of fire hydrants, abandonment of existing water main, and all other appurtenant work on Cushing Avenue and Knox Street. | Belmont (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » KINGSTON, TOWN OF (PLYMOUTH) | BID | site grading, furnish and install six leaching fields, each approximately 40,500 ft. in size along with associated distribution boxes and piping, install approximate 1,000 linear foot access road, 2,450 linear feet of ten-inch ductile iron pressure pipe force main, paving, loam and seed, compliance with turtle protection measures, and other Work | Kingston (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » FALMOUTH, TOWN OF (BARNSTABLE) | BID | providing approximately 4,800 linear feet of 8-inch diameter ductile iron water main and associated valves, fittings, hydrants, services, appurtenances, and surface restoration in Point Road, Wild Harbor Road from Point Road to Loren Road, Little Island Road from Quaker Road to the end, and along Edgewater Drive West from East Falmouth Highway (Route 28) to an existing 6-inch ductile iron capped water main | Barnstable County (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » SOUTHBRIDGE, TOWN OF (WORCESTER) | BID | RE-BID OTIS MDWC&SWA GOMEZ ROAD WATER SYSTEM IMPROVEMENTS COLONIAS 5541-CIF STANTEC | Southbridge (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » PEMBROKE, TOWN OF (PLYMOUTH) | BID | Work under this contract includes, but is not necessarily limited to, the abandonment of approximately 6,150 linear feet of existing 8” CI water main on Oldham Street between Center Street and Pine Tree Lane, stainless steel tapping sleeve and valves, side street connections, water service transfers, fire hydrants, trench pavement, 1-1/2” full width mill and overlay, and all necessary and incidental appurtenances to complete the installation | Pembroke (MA) | Try GovWin IQ for Free |
MASSACHUSETTS » WEYMOUTH, TOWN OF (NORFOLK) | BID | IFB - Town of Weymouth - Construction of Wharf Street Pump Station Force Main Rehabilitation | East Weymouth (MA) | Try GovWin IQ for Free |
Learn More About GovWin IQ for MASSACHUSETTS Providers
GovWin IQ from Deltek is the industry-leading platform providing the most comprehensive market intelligence for U.S. federal, state, local and Canadian governments. GovWin IQ is uniquely built, backed and continuously updated by award-winning industry experts who receive first-hand intelligence from government decision-makers. With this intelligence, GovWin IQ enables companies to identify early stage opportunities, plan strategically, build relationships and navigate the competitive landscape. See why thousands of companies rely on GovWin IQ to get ahead of the competition and win more business in the public sector. Deltek.com/GovWin
To learn more about GovWin IQ's solutions for MASSACHUSETTS vendors, click here.