GovWin.com »Sample Contract Data»ILLINOIS»Paving services»Construction services»Operations and maintenance services
Search Government Operations And Maintenance Services Contracts for Bid by ILLINOIS
GovWin IQ: Find and Win Government Contracts
GovWin IQ tracked 401 operations and maintenance services contracts that came up for bid by ILLINOIS in a one year period.
Sample Contracts to Bid for ILLINOIS
| Government Agency | Type | Description | Location | Contact |
|---|---|---|---|---|
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. | Try GovWin IQ for Free | |
| ILLINOIS » JOLIET, CITY OF (WILL) | BID | CITY OF JOLIET SIDEWALK MAINTENANCE | Joliet (IL) | Try GovWin IQ for Free |
| ILLINOIS » DOWNS, VILLAGE OF (MCLEAN) | BID | Village of Downs Street Maintenance | Downs (IL) | Try GovWin IQ for Free |
| ILLINOIS » PEORIA, COUNTY OF | BID | Street maintenance- | Mapleton (IL) | Try GovWin IQ for Free |
| ILLINOIS » PEORIA, COUNTY OF | BID | Street maintenance- | Bartonville (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TOLL HIGHWAY AUTHORITY, ILLINOIS STATE | BID | RR-23-4920R IL Route 390 Tollway between MP 6.0(US 20/Lake St) to MP 13.0(I-290/Eisenhower EXpwy) | Dupage County (IL) | Try GovWin IQ for Free |
| ILLINOIS » PALATINE PARK DISTRICT | BID | 2025 Asphalt Maintenance Project | Barrington (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | 0.6 miles of HMA removal, pavement overlay, patching and shoulder work on Old US 51 from IL 146 to US 51. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (767.78-Ft) Designed Overlay Project consists of hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized hot-mix asphalt binder course, placement of thermoplastic and preformed plastic pavement markings, pavement patching, combination concrete curb and gutter removal and replacement. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Milling and resurfacing, patching, pavement striping, pavment markers, and other related construction work on FAU_Route 6081 north of I-80 in Peru beginning at Il Route 251 and ending at Airport Rd; also on Charles St adjacent to east 3rd Rd in Lasalle County. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | 9.2 miles of partial depth pavement patching, resurfacing, HMA shoulders, concrete gutter replacement and guardrail updates on IL 107 from the Brown County line to north of Franklin Street in Griggsville. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,512-Ft) Standard Overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching and pavement markings. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (6,160-Ft) Standard Overlay, New Shoulders, and ADA Improvements include: Hot- mix asphalt (HMA) surface removal (cold milling), full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for curb ramps for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, new thermoplastic pavement markings and raised reflectiv | Try GovWin IQ for Free | |
| ILLINOIS » PERU, CITY OF (LASALLE) | BID | 2025 General Fund Street Program | Peru (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (2.54-Mile) Designed Overlay, New Shoulders, and ADA Improvements: The proposed consists of cold milling existing (HMA) surface, full-depth patches (Class D), resurfacing (inlay) with HMA binder and surface course, longitudinal joint sealing, replacement of curb and gutter, sidewalk removal and replacement for for sidewalks (ADA), replacement of existing aggregate shoulders with HMA, drainage structures adjustments and cleaning, pavement markings and raised reflective Location: IL 25 (Saint Char | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | 1.2 miles of pavement patching on I-64 ramps at Exit 89. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | 2.34 miles of cold milling, pavement patching, HMA resurfacing, and inlet erosion repair on IL 81 from 1st St. | Try GovWin IQ for Free | |
| ILLINOIS » MACHESNEY PARK, VILLAGE OF (WINNEBAGO) | BID | Village of Machesney Park - 2025 Pavement Maintenance Program | Loves Park (IL) | Try GovWin IQ for Free |
Contracts By Service/Industry
Learn More About GovWin IQ for ILLINOIS Providers
GovWin IQ from Deltek is the industry-leading platform providing the most comprehensive market intelligence for U.S. federal, state, local and Canadian governments. GovWin IQ is uniquely built, backed and continuously updated by award-winning industry experts who receive first-hand intelligence from government decision-makers. With this intelligence, GovWin IQ enables companies to identify early stage opportunities, plan strategically, build relationships and navigate the competitive landscape. See why thousands of companies rely on GovWin IQ to get ahead of the competition and win more business in the public sector. Deltek.com/GovWin
To learn more about GovWin IQ's solutions for ILLINOIS vendors, click here.