Search Government Road Products Contracts for Bid by TRANSPORTATION, DEPARTMENT OF
GovWin IQ: Find and Win Government Contracts
GovWin IQ tracked 99 road products contracts that came up for bid by TRANSPORTATION, DEPARTMENT OF in a one year period.
Sample Contracts to Bid for TRANSPORTATION, DEPARTMENT OF
| Government Agency | Type | Description | Location | Contact |
|---|---|---|---|---|
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Installation of stop ahead/stop signs, advance flashing beacons, and pavement markings on IL 75 at Rock City Rd.; and Springfield Ave. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Resurfacing, sidewalk replacement, curb and gutter, and accessible pedestrian signals on Pratt Avenue, from Lincolnwood Drive to McCormick Boulevard in Lincolnwood. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (7.04-Mile) Designed Overlay and Shoulder Reconstruction includes (HMA) removal earth excavation, pavement patching, resurfacing with HMA asphalt, full depth HMA shoulder, pavement markings, raised reflective markers, curb and gutter removal and replacement. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Remove and replace sidewalks, curb and driveway pavements, and install flashing beacons for pedestrian crossing on IL 121 from Jefferson Street to Church Street in Bethany. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Various Phase III Projects, Various Routes, Various Counties, Region One/District One | Cook County (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Traffic signal modernization at various locations in DeKalb County. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Various Phase I/II/III Projects, Various Routes, Various Counties, Region One/District One | Cook County (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (2,067-Ft) Designed Overlay, Curb Ramps improvements (ADA), Sidewalk Replacement consists of milling existing asphalt surface, pavement patching, HMA surface course and HMA binder course, sidewalk removal and replacement, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, curb ramps for sidewalks, raised reflective pavement markers, Location: IL 53 (Baltimore Street), from Kankakee Street to West of Forked Creek within the | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (1,830-Ft) Standard Overlay, Pavement Replacement, Designed Overlay and ADA improvements consists of HMA (overlay) with HMA binder and surface course, full depth PCC pavement removal and replacement, cold milling of existing asphalt surface, sidewalk removal and replacement, curb ramps for sidewalks (ADA) improvements, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings and raised reflective pavement markers. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (3,775-Ft) Realignment and Reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and cross-road reconstruction, existing bridge removal, storm sewer, drainage structures, detention ponds, earth excavation and grading, retaining and noise walls, barrier and moment slab construction, bridge rehabilitation and replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, d | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Signal modifications, pedestrian crossings and sidewalks at the intersection of IL 13 and Halfway Road in Marion. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Removing existing guardrail delineators and barrier wall delineators and installing new guardrail delineators and barrier wall delineators within the limits of each individual work order. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | Traffic signal modernization at various locations throughout District 8. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | This is for Various Local Agencies throughout District 8 | Randolph County (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | This Project Work Includes: BIT SURF REM BT JNT 2" (405 SQ YDS); BIT SURF REM INTERSECTION PROFILE 2" (3,318 SQ | Machesney Park (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (1.12-Mile) Designed Overlay, Traffic Signal Modernization, ADA Improvement consists asphalt surface removal, pavement patching, (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, traffic signal modernization, accessible pedestrian signal improvements, detector loop replacement, raised reflective pavement markers, pavement marking. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | A. Bituminous Materials Applied (Liquid Asphalt HFR2SP) - City Streets - 9,500 Gallon | Percy (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. | Try GovWin IQ for Free | |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (1.40-Mile) Standard Overlay, ADA Improvements: Hot-mix asphalt surface removal earth excavation, new shoulders, pavement patching, hot-mix asphalt surface course, hot-mix asphalt binder course, curb and gutter removal and replacement, longitudinal joint sealing, thermoplastic pavement markings, raised reflective pavement markers, detector loops replacement and incidental and collateral work Project is located on I-55 (North) Frontage Road, from Clarendon Hills Road to Cass Avenue, within the Ci | Darien (IL) | Try GovWin IQ for Free |
| ILLINOIS » ILLINOIS STATE DEPARTMENTS » TRANSPORTATION, DEPARTMENT OF | BID | (4,602-Ft) Smart Overlay improvements include curb and gutter spot repairs (remove and replace), hot-mix asphalt (HMA) surface removal and replacement with (cold milling and inlay), full-depth patches (Class D), thermoplastic pavement markings, raised reflective pavement markers, detector loops. | Try GovWin IQ for Free |
Contracts By Service/Industry
Learn More About GovWin IQ for TRANSPORTATION, DEPARTMENT OF Providers
GovWin IQ from Deltek is the industry-leading platform providing the most comprehensive market intelligence for U.S. federal, state, local and Canadian governments. GovWin IQ is uniquely built, backed and continuously updated by award-winning industry experts who receive first-hand intelligence from government decision-makers. With this intelligence, GovWin IQ enables companies to identify early stage opportunities, plan strategically, build relationships and navigate the competitive landscape. See why thousands of companies rely on GovWin IQ to get ahead of the competition and win more business in the public sector. Deltek.com/GovWin
To learn more about GovWin IQ's solutions for TRANSPORTATION, DEPARTMENT OF vendors, click here.